Laserfiche WebLink
Scraper Worksheet Cont'd Task#06A Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Place 6"topsoil over N.Karp Pond area <br /> Site: South Fruita Gravel Pit Permit Action: 2022 Permit/Job#: M1981243 <br /> PROJECT IDENTIFICATION <br /> Task#: 06A State: Colorado Abbreviation: None <br /> Date: 5/4/2022 County: Mesa Filename: M243-06a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 627G w/push-pull <br /> -Dozer: Cat D8T-8SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA 100 NA NA <br /> Ownership cost/hour: $188.81 $97.46 NA $97.46 NA NA <br /> Operating cost/hour: $169.82 $97.63 NA $97.63 NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA $0.00 NA NA <br /> Ripper op.cost/hour: NA $0.00 NA $0.00 NA NA <br /> Operator cost/hour: $47.07 $40.04 NA $40.04 NA NA <br /> Unit Subtotals: $405.70 $235.13 NA $235.13 NA NA <br /> Number of Units: 2 1 0 1 0 0 <br /> Group Subtotals: Work: $1,046.53 Support: $235.13 Maint: $0.00 <br /> Total work team cost/hour: $1,281.66 <br /> MATERIAL QUANTITIES <br /> Initial volume: 10,890 CCY Swell factor: 1.215 <br /> Loose volume: 13,231 LCY <br /> Source of estimated volume: 4 ac around pond(TR-3),9.5 ac processing area 6"thick <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Top Soil Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br /> CIRCES Cost Estimating Software <br />