My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-27_PERMIT FILE - C1981019 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2022-01-27_PERMIT FILE - C1981019 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 10:03:03 AM
Creation date
5/18/2022 10:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
1/27/2022
Doc Name
Addendum Collom and South Taylor Highwall Mining Geotechnical Design
Section_Exhibit Name
Volume 20 Exhibit 27 Item 7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Lee Sampson <br />December 7, 2021 <br />Page 6 <br /> <br />Agapito Associates, Inc. <br /> <br /> <br /> <br />Design <br />Depth of Cover, ft 4 5 6 7 8 9 10 12 14 16 18 20 22 <br />100 7.2 7.8 8.4 9.0 9.4 9.9 10.3 12.0 14.0 16.0 18.0 20.0 22.0 <br />140 10.8 12.0 13.0 13.9 14.7 15.5 16.2 17.5 18.7 19.7 20.7 21.6 22.4 <br />180 14.7 16.4 17.6 18.9 20.2 21.3 22.3 24.3 26.1 27.7 29.2 30.6 32.0 <br />220 16.4 20.0 22.3 24.0 25.6 27.1 28.6 31.2 33.6 35.8 37.9 39.9 41.8 <br />260 18.8 21.1 24.3 28.0 31.1 33.0 34.8 38.1 41.2 44.0 46.7 49.3 51.7 <br />300 21.7 24.4 26.9 29.2 32.4 36.0 40.0 45.1 48.8 52.3 55.6 58.7 61.7 <br />340 24.9 27.8 30.5 33.2 35.7 38.1 40.9 48.0 56.0 60.6 64.5 68.2 71.7 <br />380 28.1 31.4 34.4 37.2 40.0 42.8 45.4 50.4 57.0 64.0 72.0 77.7 81.8 <br />420 31.3 35.0 38.4 41.6 44.5 47.4 50.4 56.0 61.4 66.7 74.0 81.2 88.2 <br />460 34.5 38.7 42.4 45.9 49.2 52.3 55.3 61.7 67.6 73.4 78.9 84.6 92.2 <br />500 37.7 42.3 46.4 50.3 53.9 57.3 60.6 67.3 73.9 80.3 86.4 92.4 98.2 <br />540 40.9 45.9 50.5 54.7 58.6 62.4 65.9 72.9 80.2 87.2 94.0 100.6 107.0 <br />580 44.1 49.5 54.5 59.0 63.3 67.4 71.3 78.5 86.4 94.1 101.5 108.8 115.8 <br />Coal strength, psi 900 Mining width, ft 11.50 No. web pillars 19 <br />Pillar widths in italics have width-to-height ratios of 1.0 <br />Mining Height, ft <br />7 <br />11 <br />15 <br />19 <br />23 <br />27 <br />31 <br />35 <br />39 <br />43 <br />47 <br />51 <br />55 <br />59 <br />63 <br />67 <br />71 <br />75 <br />79 <br />83 <br />87 <br />91 <br />95 <br />99 <br />103 <br />107 <br />111 <br />115 <br />100 140 180 220 260 300 340 380 420 460 500 540 580REQUIRED BARRIER PILLAR WIDTH, ft DEPTH OF COVER, ft <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />12 <br />14 <br />16 <br />18 <br />20 <br />22 <br />Mining <br />Height, <br />ft <br />Figure 2b. Barrier Pillar Design Chart—South Taylor G78 Seam
The URL can be used to link to this page
Your browser does not support the video tag.