My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-27_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2022-01-27_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 9:39:20 AM
Creation date
5/18/2022 9:02:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/27/2022
Doc Name
Performance Standards
Section_Exhibit Name
Volume 15 Rule 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Collom – Rule 4, Page 12 Revision Date: 7/28/21 <br /> Revision No.: MR-237 <br /> <br />Groundwater Fill Piezometers - Monitoring of the West Pit fill piezometer and Section 16 Fill piezometer <br />have been discontinued. The West Pit Fill and West Taylor Fill piezometers will be monitored quarterly <br />for water levels. One additional piezometers will be installed into the toe of East Taylor Fill, once <br />constructed, as described in Exhibit 21 Item 1. <br /> <br />A future spoil water monitoring well will be drilled (and water quality monitored) as identified on Map <br />41B in the reclaimed Collom Pit area to monitor and measure the potential development of a spoil aquifer. <br />This location represents the lowest point in the Collom Pit. <br />4.05.14 Transfer of Wells <br /> <br />Please see Section 4.05.14 in Volume 1. <br />4.05.15 Water Rights and Replacment <br /> <br />Please see Section 4.05.14 in Volume 1 and Section 2.04.7(2) in Volume 15. <br />4.05.16 Dischrage of Water into an Underground Mine <br /> <br />This section is not applicable to the Collom Mine. <br />4.05.17 Postmining and Rehabilitation of Sediment Pond, Diversions, Impoundments, and <br />Treatment Facilities <br /> <br />Please see Section 4.05.17 in Volume 1. <br />4.05.18 Stream Buffer Zones <br /> <br />Lands within 100 feet, or greater distance if required, of a perennial, an intermittent, or an ephemeral <br />stream with a drainage area larger than one square mile are required to be protected under Rule 4.05.18, <br />unless the Division specifically authorizes surface operations within the stream buffer zone. Stream <br />buffer zones have been identified along Wilson Creek and Jubb Creek, as the drainage area reporting to <br />these streams is larger than one square mile. Colowyo will be developing the Collom Haul Road which <br />will be inside the stream buffer zone on both Wilson Creek and Jubb Creek. <br /> <br />The Collom Haul Road will cross Wilson Creek as shown on Map 25E Sheet 1. During construction <br />Colowyo will install a round culvert, and will employ proper best management practices (BMPs) during <br />the construction phase in accordance with Colowyo’s approved stormwater management plan, Section <br />401 certification, and US Army Corps 404 permit.. <br /> <br />The Collom Haul Road will also cross Jubb Creek as shown on Map 25E Sheet 1. The construction of the <br />crossing will be similar to the Wilson Creek crossing and will utilize the same BMPs as will be installed <br />at the Wilson Creek crossing. <br /> <br />As shown on Map 25E Sheet 1, the Collom Haul Road will parallel Jubb Creek. There will be one <br />section of the haul road that will be slighty within 100 feet of the stream. As shown on Map 25E Sheet 1, <br />at approximately Station 230+00 to 250+00 there will a slight amount of disturbance within the stream <br />buffer zone on Jubb Creek. Proper BMPs will be employed prior to any disturbance occurring within
The URL can be used to link to this page
Your browser does not support the video tag.