My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-17_INSPECTION - C1981019 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2022-05-17_INSPECTION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 7:33:47 AM
Creation date
5/18/2022 7:15:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
5/17/2022
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
5/10/2022
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 10,2022 C-1981-019/Colowyo Coal Mine ZTT <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection Y -Roads <br /> R -Availability of Records R -Reclamation Success <br /> R -Backfill&Grading Y -Revegetation <br /> R -Excess Spoil and Dev. Waste N - Subsidence <br /> Y -Explosives R - Slides and Other Damage <br /> R -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste R -Topsoil <br /> CONVOENTS <br /> This was a complete inspection by the Coloroado Division of Reclamation,Mining and Safety(Division)and an <br /> Office of Surface Mining,Reclamation and Enforcment(OSM)complete oversight inspection of the Colowyo <br /> Mine conducted by Zach Trujillo of the Division and Dan Mackinnon of OSM on June 10- 11,2022.Tony <br /> Tennyson representing Tri-State Generation and Transmission Association(Tri-State),Tom Fry representing <br /> Colowyo Coal Company(Colowyo)accompained the inspection.The weather during the inspection was windy <br /> with dry ground conditions. Temperature during the inspection was around 70 degrees fahrenheit. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> All records are kept on site at the Colowyo Mine's office building. Please see the Division's Availability of <br /> Records checklist at the end of this inspection report for more detailed information. <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1;Approximate Original Contour 4.14.2;Highwall Elimination 4.14.1(2)(f); <br /> Steep Slopes 4.14.2,4.27;Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> Backfill and grading was inspected within the West Pit as part of SL-21 and regular reclamation activities ongoing <br /> in the pit.For more information regarding the SL-21 areas,please see the associated inspection report dated June <br /> 10,2022.Active backfilling and grading was occurring at the time of the inspection. Spoil from the upper portions <br /> of the West Pit above the highwall is being excavated and hauled to eastern portion of the remaining pit.Majority <br /> of the highwall has been backfilled and connects to the older reclamation parcels to the north of the active <br /> reclamation areas of the West Pit.Final regrading of the areas still remains. Discussions with the operator state <br /> that the most eastern end of the highwall and remaining pit adjacent to the in pit Haul Road will remain un- <br /> backfilled as part of the fill used in the haul road will be used for the remaining sections of the West Pit. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.