Laserfiche WebLink
Spillway Elev Crest Length <br />(ft) <br />Left <br />Sideslope <br />Right <br />Sideslope <br />Bottom <br />Width (ft) <br />6,954.00 20.00 2.00:1 2.00:1 20.00 <br /> Pond Results: <br />Peak Elevation: 6,953.47 ft <br />Dewater Time: 2.91 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />Elevation Area <br />(ac) <br />Capacity <br />(ac-ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />6,930.00 0.001 0.000 0.000 <br />6,931.00 0.036 0.014 0.000 <br />6,932.00 0.076 0.069 0.000 <br />6,933.00 0.110 0.161 0.000 <br />6,934.00 0.134 0.283 0.000 <br />6,935.00 0.156 0.428 0.000 <br />6,936.00 0.178 0.595 0.000 <br />6,937.00 0.201 0.785 0.000 <br />6,938.00 0.226 0.998 0.000 <br />6,939.00 0.252 1.237 0.000 <br />6,940.00 0.280 1.504 0.000 <br />6,941.00 0.310 1.799 0.000 <br />6,942.00 0.340 2.123 0.000 <br />6,943.00 0.373 2.480 0.000 <br />6,944.00 0.409 2.871 0.000 Low hole SPW #1 <br />6,945.00 0.446 3.298 0.473 10.94* <br />6,946.00 0.486 3.764 0.669 8.43* <br />6,947.00 0.527 4.270 0.819 7.48* <br />6,948.00 0.571 4.819 0.945 7.02* <br />6,949.00 0.615 5.412 1.057 6.78* <br />6,950.00 0.660 6.049 1.158 6.95 <br />6,951.00 0.706 6.732 1.251 6.90 <br />6,952.00 0.754 7.462 1.337 6.85 Spillway #1 <br />6,953.00 0.804 8.241 8.509 4.75 <br />6,953.47 0.830 8.633 10.173 3.80 Peak Stage <br />6,954.00 0.857 9.072 12.033 Spillway #2 <br />6,955.00 0.975 9.987 63.138 <br />6,956.00 1.033 10.991 184.415 <br />*Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. <br />Filename: East Taylor Pond 25 Yr 24 Hr Post Mine.sc4 Printed 11-08-2021 <br />SEDCAD 4 for Windows <br />Copyright 1998 -2010 Pamela J. Schwab <br />Civil Software Design, LLC 18