Laserfiche WebLink
Bottom <br />Width (ft) <br />Left <br />Sideslope <br />Ratio <br />Right <br />Sideslope <br />Ratio <br />Slope (%)Freeboard <br />Depth (ft) <br />Freeboard <br />% of Depth <br />Freeboard <br />Mult. x <br />(VxD) <br />12.00 3.0:1 3.0:1 9.8 3.67 <br /> Riprap Channel Results: <br />Simons/OSM Method - Steep Slope Design <br />w/o Freeboard w/ Freeboard <br />Design Discharge: 83.09 cfs <br />Depth: 0.57 ft 4.24 ft <br />Top Width: 15.42 ft 37.44 ft <br />Velocity*: <br />X-Section Area: 7.82 sq ft <br />Hydraulic Radius: 0.501 ft <br />Froude Number*: <br />Manning's n*: <br />Dmin: 3.00 in <br />D50: 9.00 in <br />Dmax: 11.25 in <br />Velocity and Manning's n calculations may not apply for this method. <br />Structure #11 (Pond) <br /> TD-2 Stockpond <br /> Pond Inputs: <br />Initial Pool Elev: 7,445.00 ft <br />Initial Pool: 0.09 ac-ft <br />Emergency Spillway <br />Spillway Elev Crest Length <br />(ft) <br />Left <br />Sideslope <br />Right <br />Sideslope <br />Bottom <br />Width (ft) <br />7,454.00 30.00 2.00:1 2.00:1 20.00 <br /> Pond Results: <br />Peak Elevation: 7,454.60 ft <br />Dewater Time: 0.52 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />Filename: East Taylor Pond 25 Yr 24 Hr Post Mine.sc4 Printed 11-08-2021 <br />SEDCAD 4 for Windows <br />Copyright 1998 -2010 Pamela J. Schwab <br />Civil Software Design, LLC 12