Laserfiche WebLink
Structure Detail: <br />Structure #17 (Pond) <br /> Simulated 250 GPM - East Taylor Seep <br /> Pond Inputs: <br />Initial Pool Elev: 90.01 ft <br />Initial Pool: 0.00 ac-ft <br />*Sediment Storage: 0.00 ac-ft <br />Dead Space: 0.00 % <br />*No sediment capacity defined <br /> Pond Results: <br />Peak Elevation: 92.05 ft <br />H'graph Detention Time: 2.21 hrs <br />Pond Model: CSTRS <br />Dewater Time: 0.40 days <br />Trap Efficiency: 76.86 % <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />Elevation Area <br />(ac) <br />Capacity <br />(ac-ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />90.00 0.050 0.000 0.000 Top of Sed. Storage <br />90.01 0.050 0.001 0.000 <br />91.00 0.051 0.050 0.560 <br />92.00 0.190 0.164 0.560 <br />92.05 0.161 0.174 0.560 9.70 Peak Stage <br />93.00 0.260 0.388 0.560 <br />94.00 0.350 0.692 0.560 <br />95.00 0.440 1.086 0.560 <br />96.00 0.540 1.575 0.560 <br />97.00 0.650 2.169 0.560 <br />98.00 0.760 2.873 0.560 <br />99.00 0.880 3.693 0.560 <br />100.00 1.200 4.728 0.560 <br />101.00 1.240 5.948 0.560 <br />102.00 1.414 7.275 0.560 <br />103.00 1.600 8.781 0.560 <br />Filename: East Taylor Pond 10 Yr 24 Hr Post Mine.sc4 Printed 11-08-2021 <br />SEDCAD 4 for Windows <br />Copyright 1998 -2010 Pamela J. Schwab <br />Civil Software Design, LLC 11