Laserfiche WebLink
2 <br /> Hydrograph Report <br /> Hydraflow Hydrographs Extension for AutodeskO Civil 31DO by Autodesk,Inc.v2022 Friday,01 /14/2022 <br /> Hyd. No. 1 <br /> Drainage Basin 1 Pre-Mine <br /> Hydrograph type = SCS Runoff Peak discharge = 5.708 cfs <br /> Storm frequency = 5 yrs Time to peak = 12.18 hrs <br /> Time interval = 1 min Hyd. volume = 32,715 cuft <br /> Drainage area = 62.550 ac Curve number = 80 <br /> Basin Slope = 0.0 % Hydraulic length = 0 ft <br /> Tc method = User Time of conc. (Tc) = 23.00 min <br /> Total precip. = 1.18 in Distribution = Type II <br /> Storm duration = 24 hrs Shape factor = 484 <br /> Drainage Basin 1 Pre-Mine <br /> Q (cfs) Hyd. No. 1 --5 Year 0 (cfs) <br /> 6.00 6.00 <br /> 5.00 5.00 <br /> 4.00 4.00 <br /> 3.00 3.00 <br /> 2.00 2.00 <br /> 1.00 1.00 <br /> 0.00 0.00 <br /> 0 2 4 6 8 10 12 14 16 18 20 22 24 26 <br /> Hyd No. 1 Time (hrs) <br />