E-2 shows the volumes of topsoil and overburden required for reclamation and the material <br /> volumes that will be stripped and stockpiled. <br /> Table E-2 Reclamation Volumes <br /> Material Available on Site Requirements <br /> Phase Phase Topsoil Overburden, <br /> Areas Stripe. ;. ` a) Required BackfUl Required <br /> ages <br /> 1 25.8 ( 17,240 124,170 4,060 21,300 <br /> 2 1 11.3, 2,430 18'aw <br /> 3 14.4 9,660 69,560 2,600 ! 20,190 <br /> 4 16.1 1t?7911 ,;,, ;� 2,900 191$00 <br /> Totals 67.6 45,290 326,080 11,990 80,090 <br /> 2. Topsoil Replacement <br /> Approximately 4 to 6 inches of topsoil will be stripped and stockpiled prior to mining. After <br /> backfilling and grading is completed during reclamation, topsoil will be replaced to an average <br /> depth of 5 inches in all disturbed areas outside of the lakes and on the topsoil zone of the lake <br /> slopes. It will be directly placed by loaders and haul trucks. All topsoiled areas will be disced to <br /> aid in root penetration. <br /> 3. Haul Roads and Access <br /> All internal haul roads will be graded and seeded to fit the post mine land use. The access haul <br /> road from CO-65 will be left in place to provide access to the processing site. <br /> 4. Reclamation Timetable and Sequence <br /> The sequence and timing of reclamation can be seen in Table E-3 below. The reclamation <br /> schedule is dependent on the rate of mining which will fluctuate due to market demands. The <br /> operator will reclaim the site concurrently with the progression of mining to limit the total <br /> disturbance. <br /> Table E-3 Reclamation Timetable <br /> Description Time Required <br /> Develop and rune gas 1 /' ,,, 5 yeas <br /> Develop and mine phase 2 while reclaiming previous 5 years <br /> phases <br /> Delta Paving Gravel Pit E-2 Lewicki&Associates <br /> Apri12022 <br />