least two feet of inert material will be placed over the area and mining will move to a different <br /> area. <br /> 2. Mining Timetable <br /> Mining operations at the Delta Paving Gravel Pit are expected to take at least 16 years to <br /> complete, based on an annual average production of 100,000 tons. Actual production rates will <br /> fluctuate based on market conditions. An approximate mining timetable based on this <br /> production and the phased mining plan is shown in Table D-1. <br /> Table D-1 Mining Timetable <br /> Description Time Required <br /> can ofsf .. ,,. <br /> Mine and reclaim Phase 1 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> ;i0tial s ppbg"Of� ' �'f 2 i�tth <br /> suuthem of th" r„ <br /> Mine and reclaim Phase 2 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> l ittW striippl afnew '�9� :...1 xczcanth <br /> Mine and reclaim Phase 3 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> t111 ' <br /> Mine and reclaim Phase 4 according to 4 years <br /> approved plans.Reclamation occurs as mining <br /> has reached its maximum extents in an area. <br /> /, <br /> 1F' l ye; <br /> 3. Mine Facilities and Operation <br /> The site will contain the following facilities and equipment: <br /> Facilities: <br /> - Portable hot mix asphalt (HMA) plant <br /> - Concrete batch plant <br /> - Portable wash plant <br /> - Portable crushing & screening unit <br /> - Gradation screen/conveyor(portable) <br /> - Portable toilet <br /> Delta Paving Gravel Pit <br /> April 2022 D-2 Lewicki&Associates <br />