PERMIT#:M-1981-243 <br /> INSPECTOR'S INITIALS:ACY <br /> INSPECTION DATE:April 26,2022 <br /> OBSERVATIONS <br /> This inspection was conducted as part of the Colorado Division of Reclamation, Mining and Safety (Division) <br /> normal monitoring program. The South Fruita Gravel Pit is a 112c permitted site that includes a total of 104 <br /> permitted acres. The site located one mile south of Fruita, Colorado and is accessed from Maple Street. Jim <br /> Doody of Grand Junction Concrete Pipe Co. represented the operator and accompanied Amy Yeldell of the <br /> Division on the inspection. <br /> The mine identification sign and affected area boundary markers are in place and in compliance with Rule <br /> 3.1.12. A signs is attached to the gate at the permit entrance. The permit boundary is delineated by fences. The <br /> site was inactive at the time of the inspection. <br /> The scale and scale house is located in the center of the pit. Fuel was observed in a secondary containment <br /> adjacent to the scale house. No processing equipment was on site. <br /> The site appears to be relatively unchanged from the previous inspection. The pit is broken into two major areas <br /> with the access road separating them. The pond to the west of the road is the Arcuby Pond. Then to the east of <br /> the road is the North Karp Pond(active) and the South Karp Pond(reclaimed). <br /> The Arcuby pond is located on the western side of the permit. The northeastern side has been mined and <br /> backfilled.No vegetation was growing in the `field' areas. The Arcuby Pond was inundated at the time of the <br /> inspection and is estimated to be 15 surface acres. Mining is progressing towards the south in this area with the <br /> stockpile yard and processing area yet to be mined. Approximately 700 linear feet of highwall has been left near <br /> vertical. All other highwall slopes appear to be properly graded(above the water's surface). In the stockpile <br /> areas a few small piles remain and are stable.New survey laths were observed around the southern side Arcuby <br /> Pond indicating that future disturbances maybe likely to occur this summer. What appears to be topsoil is stored <br /> on the western side of this stockpile area. <br /> The eastern side of the permit area is the Karp Pit, which consists of two inundated ponds. The southern Karp <br /> Pond is nearly all reclaimed. The slopes around the inundated pond itself are properly graded and have adequate <br /> vegetation. A road goes all the way around the pond with a moderately sized stockpile yard to the south of the <br /> pond adjacent to the river. This area is far larger than just a road and will need to be reclaimed before the <br /> southern Karp Pond is eligible for release. In this stockpile area are misc. small stockpiles of assorted material <br /> that has yet to be consolidated to active mine areas. There are also concrete footers from what appears to be the <br /> old scale location. Remaining reclamation in this area consist of stockpile removal and revegetation. <br /> The northeastern area is the active the Karp Pond. It was also inundated at the time of the inspection. The <br /> northeastern banks of the Karp Pit were graded and all other slopes appear to be near vertical. Staff estimates <br /> that approximately 2000 linear feet requires grading. Mining has the potential to move further north towards the <br /> permit boundary as well as into the stockpile yard located on the western site. Little to no material was observed <br /> in the stockpile area. <br /> Previous annual report maps have omitted the lower Karp pond. This area has not yet been released and needs <br /> to be reflected on all maps until such time. Attached is a previous mine plan map depicting the permitted areas <br /> and affected land types similar to current site conditions. Overall the operator is encouraged to finish <br /> reclamation in areas where no future mining will take place. The partially reclaimed areas cannot be released <br /> and may inhibit other areas with completed reclamation from being eligible for release. <br /> Page 2 of 8 <br />