Laserfiche WebLink
RECEIVED <br /> SCANNED <br /> s- MAY 0 4 2022 <br /> Resstwar'ibilhies an r Perrnittce: DIVISION OF RECLAMATION <br /> MMINNINNG�AN�SAFETY <br /> Upon application approval and permit issuance,this application becomes a legally binding docurliCid'Zlere arc.this re arc a ntntherof <br /> important requirements ss hich you,as a permittec,should firmly understand. 13wse ttquirenctus arc listed below. Please read and hula <br /> c&-ji_vMirrqRlent. in the spruce provided. to xkrowicdgc that you u►Merstvd your obhgitions. If you do not understand these <br /> obligations then please contact this Office for a full explamtion. <br /> !. Your obligation to acclaim the.tic is not limited to the amount of the financial warmuty. You assume legal liabihq <br /> for all reasonable expetrses Much die Board or the Offrcr nim incur to reclaim the affected lands associatud uuith your <br /> nuning operation in the went your pernut is revoked and financial u►.irrrtuty is forfeited: <br /> 2 Tlx:Hoard may suspend or revoke this perntit,orassess a civil penalty.upon a finding that the pern»ttec violated the <br /> terms or conditions,of this permit. the Act. the Mineral Rules and Regulations. or that information contained in the <br /> application or your permit misrepresent ntnportann nurtchal facts. <br /> r 1 If your mining and reclanwlion opemions affect areas beyond the boundaries of an appro%ed permit houndan. <br /> substantial ctc nl peralfics.to you as permittee can result: <br /> d Any nodification to the approved nuning aril reclancnion plan from those described in your approved application <br /> requires%ou to submit a permit modification and obtain approval from the Hoard or Office. <br /> 5. If is your wspontsibility to notify the Office of any changes in your address or phone number. <br /> 6. Upon permit issuance and prior to beginning on-site mining activity.you must post a sign at the entrance of the mire <br /> site.which shill be clearly visible from the a ccess road.with the folio%ing information(Rude 3.1.12): <br /> a the name of the operator. <br /> b. a statement (fiat a reclamation permit for the operation has been issued by the Colorado tilined Land <br /> RccLimation Hoard:and. <br /> c. the:permit uxtmber <br /> 7. The boundaries of the;permit boundary area must be marked by monuments or other markers that are ckarhy visible <br /> - and adequate to dchrtcanc such boutudaries prior to site disturbance: <br /> X. It is a pro%is►on of this permit ilia the operations will be conducted in accordance with the terms and conditions listed <br /> in y our atpplication.as well as st ith the prov isions of•Uw Act and the hirer l Rules and Regulations in effect a i the tittle tine <br /> pernut is issued <br /> _ ') Annually,on fix:annivetsar date of pernut issuance.you must submit an armual fee as specified by Statutc,and an <br /> annual report which includes a nap describing the acreage affected and the acreage reclaimed to date(if there arc oranges <br /> from the previous ycnr).am monitoring required by the Reviamilion Plan to be subnitted.anntralk on the anniversan date <br /> of the pemit approval. Annual fees an:for thw precious year a Perim is field. For example.a permit with the atuuvcrsan <br /> date of huh 1. 1995.the annual fee is for the period of July 1, 1994 through June 10, 1993 Failure to submit your annual <br /> fee and report by the permit auutn ersan date nray result in a civil penalty,revoc a ion of y our permit,and forfeiture of your <br /> financial warranty. It is your responsibility. as the permitice,to continue to pay your annual fee to the Office until the <br /> lic►ard releases you from your total reclamation responsibility. <br /> lu. For iQm1 vcnt�rrc/pfnntershiR pgmutttx:the signing representative is authorized to sign when document and a pouter <br /> of attorney (prodded by the iviniuerts))authorizing the srgnstunt:of the represetutauve is attactwd to this application. <br />