My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-04_REVISION - C1981018 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2022-05-04_REVISION - C1981018 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 10:25:31 AM
Creation date
5/5/2022 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
5/4/2022
Doc Name
Proposed Revision Materials
From
Blue Mountain Energy
To
DRMS
Type & Sequence
TR74
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The merging of RA-2/3 and RA-4 began during the summer and fall of 1998. <br /> Map 76 shows how refuse lifts are constructed. Refuse is dumped in the area being filled and <br /> spread in layers to dry. After drying, the refuse is built into layers not exceeding two feet and <br /> compacted to 90 percent of maximum dry density (AASHTO Spec. T99-74) as required by Section <br /> 4.10.4. The refuse material has to dry out before it can be compacted properly. During the winter <br /> months or at times when the material cannot be properly spread and compacted, the refuse <br /> material may be temporarily stored on top of the refuse piles. Storage of refuse material in <br /> temporary piles will not exceed 300,000 tons at any one time. <br /> Tests shall be performed on the waste bank to ensure the minimum level of compaction is reached. <br /> These tests shall be made in areas that represent the area being compacted. No test will be <br /> performed during periods of rain, snowmelt or when the pile is unreasonably wet. Tests shall be <br /> performed on a minimum of a monthly basis during the active compaction process of the refuse pile <br /> construction. The tests shall be performed with a nuclear density meter. <br /> During the early phase of mine permitting when no actual refuse material was available for testing, <br /> the refuse strength and stability characteristics were assumed based on typical scenarios at other <br /> sites. Once the actual refuse became available,Western Fuels-Utah (now BME) contracted Lincoln <br /> DeVore Laboratories to develop a Proctor curve of the material. Nuclear density equipment was <br /> purchased to verify required compaction results. It was found that the original assumptions were <br /> quite conservative compared to the actual data. Based upon the actual data, the safety factor <br /> exceeds 1.5 using a slope of 3(h):1(v). This factor will be significantly higher for a slope of 4(h):1(v) <br /> and 5(h):1(v) as stipulated in the permit. A letter dated January 30, 1987 from Mike Weigand, Chief <br /> Engineer at the Deserado Mine supporting the above findings is included as Illustration 42. <br /> Additional strength tests on the refuse and stability analysis with a 4:1 slope were conducted by <br /> Lincoln-DeVore, Inc. of Grand Junction. The static safety factor was calculated to confirm that it <br /> exceeded 1.5. A letter from Lincoln-DeVore is included in Illustration 42A. In 2004 additional cores <br /> of the refuse were tested for strength and stability. Based on the new data, Lincoln DeVore <br /> concluded that the refuse piles would be adequately stable at 3(h): 1(v) and 200 feet in height. This <br /> report is included in Illustration 42B. <br /> Huddlesone-Berry, Inc., of Grand Junction performed a geotechnical investigation of the proposed <br /> RP-A area and analyzed the stability of the refuse pile slopes. Every scenario in the analysis <br /> resulted in a factor of safety well over 1.5. The report is included as illustration 42C. <br /> Most of the sedimentation ponds in the Refuse Disposal Area will be a combination dug-out or <br /> in-situ and embankment type. This design was chosen because of layout and construction <br /> considerations. Soils in this area are mostly Turley fine sandy loam and Moyerson silty-clay. The <br /> Moyerson soils have properties suitable for dam embankment construction. Where ponds are <br /> constructed in in-site materials not suitable for pond construction, suitable materials will be imported <br /> TR-74 (4/2022) IV-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.