My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-04_REVISION - C1981018 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2022-05-04_REVISION - C1981018 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 10:25:31 AM
Creation date
5/5/2022 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
5/4/2022
Doc Name
Proposed Revision Materials
From
Blue Mountain Energy
To
DRMS
Type & Sequence
TR74
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> Blue Mountain Energy plans to combine the refuse disposals areas RP-234 and RP-5 into a single area to <br /> be known as RP-2345.The original permitted refuse disposal areas are nearing their original permitted <br /> configuration and there is continuing need for refuse disposal area. <br /> In 2019, an unexpected change in coal processing waste moisture content occurred. Coal waste slurry <br /> from the bottom of the clarifier used to be discharged into the old, sealed D Seam mine. That disposal <br /> avenue unexpectedly ended, and the high moisture material had to be routed to the refuse piles.The <br /> high moisture material must be spread out and dried before it can be properly compacted. <br /> Fortunately,the refuse disposal area RP-A was approved at the end of 2019.Though it was originally <br /> planned to serve the primary disposal needs as RP-234 and RP-5 were completed,the high moisture <br /> material requires a significant surface area to dry out. This is especially true during the winter as the <br /> material must be stored in low spaced out rows until spring when it can be spread and dried.The <br /> surface area of all the current disposal areas is required to make it through the winter. Combining and <br /> continuing use of the old disposal areas will facilitate the refuse drying process with minimal new <br /> disturbance. <br /> The valley between the original piles will be filled and the pile design height will be increased up to the <br /> maximum as outlined in Illustration 42B.Terraces will be increased to 20 feet in width. <br /> Hydrology <br /> The reconfigured disposal area was modeled in SEDCAD 4.The structures are numerated, and the sub <br /> watershed areas are delineated on the accompanying Map 165. Rainfall data is included in Appendix A. <br /> Curve numbers previously calculated for refuse areas were used. SEDCAD results are included in <br /> Appendices B, C and D. <br /> The existing sediment ponds along with most of the existing ditches will be utilized. The ditches in the <br /> valley will mostly be buried, but remaining portions will be slightly reconfigured to accommodate the <br /> toe of the refuse slope. The main change to the existing structures will be the ditches to the south. <br /> Rather than flowing down the valley between the two piles,there will be one continuous mild slope <br /> erodible channel flowing east-northeast along the south perimeter of the combined piles. <br /> The overall area is unchanged, but the additional mild sloped terraces attenuate the flow rate <br /> significantly. More area flows to the RP-5 sediment pond, but the pond water elevation does not reach <br /> the emergency spillway during the 100-year storm.The other sediment ponds receive less water than <br /> before. No changes to the ponds or their outlet structures are required. The stage-storage and outlet <br /> hydraulics curves can be found on maps 79, 80 and 80A. <br /> All the existing structures that will continue to be utilized still have adequate capacity. The new <br /> structures are the terrace channels and the ditch around the south perimeter.These new channels are <br /> mildly sloping erodible channels not requiring rip rap.The acute junctions where a terrace meets the <br /> next downstream channel will be wide and nearly flat acting as stilling basins. Rip rap has also been <br /> Blue Mountain Energy 3 Illustration 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.