Laserfiche WebLink
1-40 Calculations for Two Ponds on the South Side of Railroad Loop Fill Slope (Ponds <br /> RR-1 and RR-2) <br /> 1-41 Sediment Control Calculations - Material Storage at East Intakes <br /> 1-42 Refuse Data and Analysis (Mike Weigand's memo) <br /> 1-42A Refuse Data and Slope Stability Analysis Refuse Area 5A <br /> 1-42B Refuse Data and Slope Stability Analysis— Revised 2004 <br /> 1-43 Air Emission Permits <br /> 1-44 SEDCAD Runs on Various Areas, Small Area Exemption <br /> 1-45 SEDCAD Runs for Runoff Volume and V-Ditch Calculations, Road Base Storage <br /> Pad <br /> 1-46 Water Discharge Permit <br /> 1-47 Reclamation Cost Estimate <br /> 1-48 IBLA Decision 94-366 <br /> 1-49 Post-reclamation Refuse Area Sedimentology Calculations <br /> 1-50 Refuse Pile Temporary Ditch Specifications <br /> 1-51 BLM Conditions <br /> 1-52 Completion of Typical Degas Borehole <br /> 1-53 B-Vent Shaft#2 Road Culvert Sizing Calculations <br /> 1-54 RDH-3 Road Culvert Sizing Calculations <br /> 1-55 B-Seam Dewatering System (SH-3) <br /> I-56 SDH-3 Pond System Hydrology and Sedimentology <br /> 1-57 B-Seam Dewatering System #2 (SH-4) <br /> 1-58 Prep Plant Upgrade— Belt Press Addition <br /> 1-59 SEDCAD Runs for RP-A Pond <br /> 1-60 SEDCAD Runs for Red Wash Reservoir <br /> 1-61 1 Right Dewatering Pond Hydrology (DW-1 R) <br /> 1-62 Hydrology and Sedimentation Analysis of RP-2345 <br /> TR-74 (4/2022) <br />