Laserfiche WebLink
155 B-Vent Shaft#2, SH-1, SH-2, RDH-3 <br /> 156 B-Vent Shaft#3 <br /> 157 B-Seam Dewatering System <br /> 158 RDH#4—Rock Dust Hole and Breathable Air <br /> 159 Nitrogen Plant#2 Facilities <br /> 160 B-Seam Dewatering Area#2 <br /> 161 Geotechnical Investigation Coring—Refuse Area Evaluation Site <br /> 162 Refuse Area A Site Plan <br /> 162A Sediment Pond RP-A Site Plan <br /> 163 Discharge Point of Compliance at Existing Red Wash Reservoir#2 <br /> 164 1 Right Dewatering Discharge (DW-1 R) <br /> 164A 1 Right Dewatering Discharge Pond Details(DW-1 R) <br /> 165 Refuse Area 2345 Preliminary Plan <br /> 166 Refuse Pile Soil Stockpile Inventory <br /> TR-74 (4/2022) <br />