Laserfiche WebLink
SEDCAD 4 for Windows <br /> 14 <br /> w10 Freeboard wl Freeboard <br /> D50: 0.00 in <br /> Dmax: 0.00 in <br /> Structure #17(Pond) <br /> Middle pond <br /> Pond Inputs: <br /> Initial Pool Elev: 5,507.00 ft <br /> Initial Pool: 12.79 ac-R <br /> Drop Inlet <br /> Riser Barrel <br /> Diameter Riser Heigh Diameter Barrel Barrel Slope Mamir4s n Spillway Elev <br /> (in) (R) (in) Length(ft) (%) (ft) <br /> 36.00 8.0011 30.00 66.00 2.00I 0.0240 5,507.00 <br /> Broad-crested Weir <br /> Weir Width Spillway Elev <br /> (R) (ft) <br /> 12.00 5,508.30 <br /> Pond Results: <br /> Peak Elevation: 5,507.18 R <br /> DewaterTime: 0.75 days <br /> Dewateling time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-R) (cfs) (hrs) <br /> 5,498.00 0.670 0.000 0.000 <br /> 5,498.25 0.712 0.173 0.000 <br /> 5,498.50 0.755 0.356 0.000 <br /> ---------- <br /> 5,498-75 0.799 0.550 0.000 <br /> 5,499.00 0.945 0.756 0.000 <br /> 5,499.25 0.892 0.973 0.000 <br /> 5,499.50 0.940 1.202 0.000 <br /> 5,499.75 0.989 1.443 0.000 <br /> 5,500.00 1.040 1.696 0.000 <br /> 5,500.25 1.091 1.962 0.000 <br /> 5,500.50 1.145 2.2.42 0.000 <br /> Filename:Combination Pile 2345 100 Year.sc4 Printed 04-14-2022 <br /> Blue Mountain Energy 88 Illustration 62 <br />