My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-04_REVISION - M1980143 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980143
>
2022-05-04_REVISION - M1980143 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 11:10:35 AM
Creation date
5/4/2022 4:41:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980143
IBM Index Class Name
Revision
Doc Date
5/4/2022
Doc Name
Issuance Documents
From
DRMS
To
Bruce Neil - Neils Excavation and General Contracting, Inc
Type & Sequence
SO2
Email Name
DMC
THM
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> None <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Successor cannot agree, the Division will render its decision within 30 days. <br /> have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, i wish to WAIVE MY RIGHT TO A DECISION ON <br /> ospe tive Success r MY APPLICATION WITHIN 30 DAYS. <br /> 1 have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> htti3://mining.state.co.us/Mineral°/o2OFonns.htm). <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.