My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-02_HYDROLOGY - M1977208
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977208
>
2022-05-02_HYDROLOGY - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2022 9:25:33 PM
Creation date
5/3/2022 10:09:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Hydrology
Doc Date
5/2/2022
Doc Name
Water Monitoring - Groundwater and Surface Water
From
Cemex
To
DRMS
Annual Report Year
2022
Report Quarter_Month
1
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> ZZCEMEX MAY Q 2 UZZ <br /> Building a better future DIVISION OF RECLAMATION, <br /> MINING&SAFETY-MINERALS <br /> April 28, 2022 <br /> Ms.Amy Eschberger Via FEDEX <br /> Division of Reclamation, Mining and Safety TRK #7767 2999 9057 <br /> Environmental Protection Specialist <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: CEMEX Lyons Mine Permit M-1977-208 <br /> Technical Revision No. 12, Revised Groundwater Monitoring Plan <br /> First Quarter 2022 Monitoring Data <br /> Dear Ms. Eschberger: <br /> This letter transmits the surface water and groundwater data associated with the sampling of the <br /> cement kiln dust disposal area (C-Pit). This report includes data from the C-Pit ponded water and <br /> related groundwater monitoring for the first quarter of 2022, covering the reporting period from <br /> January 1, 2022 to March 31, 2022. Table 1 presents data for the last four quarters. <br /> Groundwater samples were collected on March 15, 2022 from the CEM-oo1 and CEM-004 <br /> groundwater monitoring wells and from the C-Pit ponded water. The inspection of groundwater <br /> monitoring well CEM-oo5 on March 15,2022 indicated that there was not enough water volume to <br /> collect a representative sample. <br /> The samples collected from C-Pit ponded water and the groundwater monitoring wells were analyzed <br /> for pH, chloride, sulfate,total dissolved solids, selenium, and thallium. The reported pH data are based <br /> on the pH analyses performed at the time of sample collection in the field (Table 1). The measured pH <br /> at groundwater monitoring well CEM-004 and analytical results for chloride, sulfate,total dissolved <br /> solids (TDS), selenium and thallium from the March 15, 2022 groundwater sample were within the <br /> target levels prescribed by TR-12, as shown in Table 1. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.