My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-29_REPORT - M2012032
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2012032
>
2022-04-29_REPORT - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2022 8:43:32 PM
Creation date
5/2/2022 9:58:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Report
Doc Date
4/29/2022
Doc Name
Activity Report
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
TR15
Annual Report Year
2022
Report Quarter_Month
1
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> (A R-Al `77U ER <br /> APR 2 9 2022 <br /> Table 1: Reagent Use L,VISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Rate Tons Total in <br /> Reagent (lbs/t) Processed Ibs <br /> Zinc Sulfate 0.525 450 236.25 <br /> SMBS 0.525 450 236.25 <br /> Areophine 3418 0.02 450 9 <br /> Danafloat 067 0.01 450 4.5 <br /> PolyFroth W20 0.11 450 49.5 <br /> Hydrated Lime 4.3 450 1935 <br /> Copper Sulfate 0.26 450 117 <br /> Sodium Isopropyl Xanthate 0.04 450 18 <br /> Flocculant AF-309 0.0511 450 22.995 <br /> 3. Tailings Management <br /> The mill generated approximately 405 tons of tailings during the first quarter 2022. What <br /> was generated was transported to the temporary lined tailings storage area and tested for <br /> SPLP, TCLP and ABA. Moisture content of the tailings was 15%. Results of SPLP, <br /> ABA, and TCLP tailings analysis were below regulatory limits. These results were <br /> submitted to the Division. <br /> Future quarterly reports will include a mass balance of reagent use as well as additional <br /> analytical results from tailings testing once the Reagent Room is certified and the mill is fully <br /> operational. <br /> If you have any questions, please contact me at (970) 325-9830. <br /> Sincerely, <br /> eyG� <br /> General Manager <br /> Ouray Silver Mines Inc. <br /> Cc: Amy Yeldell, DRMS <br /> Todd Jesse, OSMI <br /> Poppy Staub, OSMI <br /> 2 � 3 = <br />
The URL can be used to link to this page
Your browser does not support the video tag.