Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.A VG.) <br />Material consistency: <br />1.200 <br />(CAT HB <br />Dozing method: <br />1.000 <br />GIN. <br />Visibility: <br />1.000 <br />(AVG) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DA <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />MaterialWeight: <br />0.894 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.6730 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,133.67 LCY/hr <br />4534.68 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.428/LCY <br />Total job time: 15.00 Hours <br />Totaljobcost: $29,089 <br />