Laserfiche WebLink
Revision Date: 6/16/21 <br /> Revision No.: TR-149 <br />LIST OF EXHIBITS – VOLUME 20 <br /> <br /> <br />Exhibit 10, Item 6 Proposed Collom Coal Mine Project Baseline Vegetation Survey, <br />May 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 10, Item 7 Wetlands and Waters of the US Delineation for Collom Project, <br />May 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 11, Item 1 Wildlife Survey Report for the Collom Permit Study Area, August <br />25, 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 11, Item 2 2007 Wildlife Monitoring Report for the Collom Permit Study <br />Area, December 20, 2007, Cedar Creek Associates, Inc. <br /> <br />Exhibit 13C Cumulative Bond Collom Haul Road and Facilities <br /> <br />Exhibit 14, Item 7 Pre-Blast Survey – Structures within ½ Mile of Collom Mining <br />Area (Pending) <br /> <br />Exhibit 14, Item 8 Pre-Blast Survey – Offering Letters <br />Pre-Blast Structure Locations Drawing <br /> <br />Exhibit 23, Item 1 Geotechnical Report for the Temporary Spoil Pile <br /> <br />Exhibit 23, Item 2 Addendum to Geotechnical Analysis <br /> <br />Exhibit 25 Item 1 Groundwater Monitoring Well Information <br /> <br />Exhibit 26, Item 1 Alluvial Groundwater Monitoring Well Information <br /> <br />Exhibit 27, Item 1 Collom Haul Road Geotechnical Drilling <br /> <br />Exhibit 27, Item 2 Wilson Reservoir Geotechnical Drilling <br /> <br />Exhibit 27, Item 3 Collom In Pit Drilling <br /> <br />Exhibit 27, Item 4 Collom Topsoil Depth Testing <br /> <br />Exhibit 27, Item 5 Collom Facilities Geotechnical Drilling <br /> <br />Exhibit 27, Item 6 Collom Highwall Mining Geotechnical Design and Operational <br />Considerations <br /> <br />Exhibit 27, Item 7 Addendum Collom and South Taylor Highwall Mining <br />Geotechnical Design and Operational Considerations