Laserfiche WebLink
423 <br />424 <br />425 <br />426 <br />427 <br />428 <br />429 <br />430 <br />431 <br />432 <br />433 <br />434 <br />435 <br />436 <br />437 <br />438 <br />439 <br />440 <br />441 <br />442 <br />443 <br />444 <br />445 <br />447 <br />448 <br />449 <br />450 <br />451 <br />452 <br />459 <br />460 <br />461 <br />462 <br />463 <br />466 <br />467 <br />470 <br />471 <br />472 <br />473 <br />Temporary Facilities Pond Removal <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4.73 <br />$2,136.00 <br />$7,141.00 <br />$779.00 <br />$1,413.00 <br />$804.00 <br />$575.00 <br />$1,417.00 <br />$1,394.00 <br />$137.00 <br />$633.00 <br />$99.00 <br />$71.00 <br />$394.00 <br />$621.00 <br />$1,999.00 <br />$1,999.00 <br />$13,472.00 <br />$4,518.00 <br />$4,518.00 <br />$645.00 <br />$9,010.00 <br />$7,471.00 <br />$9,332.00 <br />$49,979,959.00 <br />$138,452.00 <br />$7,274.00 <br />$1,341.00 <br />$3,000.00 <br />$83,347.00 <br />$39,991.00 <br />$1,315,947.00 <br />$7,625.00 <br />$119,253.00 <br />$10,251.00 <br />$1,967.67 <br />$1,440.00 <br />$40,154.22 <br />$2,292.00 <br />$1,010.00 <br />$6,720.00 <br />Wilson Storage Pond Removal <br />DOZER <br />15.80 <br />Regrade Ditch D1 <br />DOZER <br />1.72 <br />Regrade Ditch D2 <br />DOZER <br />3.13 <br />Regrade Ditch D3 <br />DOZER <br />1.78 <br />Regrade Ditch D4 <br />DOZER <br />1.27 <br />Regrade Ditch D5 <br />DOZER <br />3.14 <br />Regrade Ditch D6 <br />DOZER <br />3.08 <br />Regrade Topsoil for Ditch DI <br />DOZER <br />0.30 <br />Regrade Topsoil for Ditch D2 <br />DOZER <br />1.40 <br />Regrade Topsoil for Ditch D3 <br />DOZER <br />0.22 <br />Regrade Topsoil for Ditch D4 <br />DOZER <br />0.16 <br />Regrade Topsoil for Ditch D5 <br />DOZER <br />0.87 <br />Regrade Topsoil for Ditch D6 <br />DOZER <br />1.37 <br />Regrade Topsoil for West Side Pond Access Road <br />DOZER <br />4.42 <br />Regrade Topsoil for East Side Pond Access Road <br />DOZER <br />4.42 <br />Regrade Topsoil for Tops oil Access Road <br />DOZER <br />29.81 <br />Regrade Topsoil for Temporary North Access <br />Road <br />DOZER <br />10.00 <br />Regrade Topsoil for Temporary South Access <br />Road <br />DOZER <br />10.00 <br />Regrade Topsoil for Tie -In Road Access Road <br />DOZER <br />1.43 <br />Reseed CollomAccess Roads (Exh.13C Table <br />13C-17 <br />REVEGE <br />16.00 <br />Regrade Topsoil for Raw WaterLine <br />DOZER <br />15.77 <br />Reseed CollomRaw WaterLine <br />REVEGE <br />16.50 <br />Load, Haul and Regrade CollomPit- RN -07 <br />Permit Term <br />TRUCKl <br />12,430.94 <br />Reseed CollomPit and Temporary Soil Pile <br />REVEGE <br />251.00 <br />Reseed CollomTopsoil Pile Footprints 26A and <br />26B <br />REVEGE <br />13.20 <br />Regrade Topsoil for Taylor Creek Pipe Crossing <br />DOZER <br />2.77 <br />Reseed Taylor CreekPie Crossing Disturbance <br />REVEGE <br />5.00 <br />Reseed CollomFacility Area <br />REVEGE <br />251.00 <br />Collom-Weed control 10% of 1133.4 ac. 3X <br />REVEGE <br />120.00 <br />Collom-Post Mining Channels forRN-07 Permit <br />Term <br />NA <br />3,999.22 <br />Plug and Seal All Wells for Collom <br />BOREHOLE <br />24.00 <br />Mobilize/demobilize equipment fromCrai <br />MOBILIZE <br />6.44 <br />Collom-Weed control in GL rec110% of 290.45 <br />ac. 3X <br />REVEGE <br />48.00 <br />Plug and Seal 16 Geotechnical Boreholes (MRI 54) <br />BOREHOLE <br />24.00 <br />Res eed Geotechnical Hole Access Corridors <br />(MR154) <br />REVEGE <br />2.40 <br />Plug and Seal 27 Collom In -Pit Drill Holes (MR- <br />186) <br />BOREHOLE <br />194.00 <br />Regrade Topsoil for Collom In -Pit Drill Pads <br />(MR174) <br />DOZER <br />4.73 <br />Regrade Topsoil for Collomhi-Pit Drill Roads <br />(MR174) <br />DOZER <br />2.08 <br />Reseed Collomin-Pit Drill Pads and Roads <br />R174 <br />REVEGE <br />11.20 <br />SUBTOTALS: <br />50099.43 <br />$124,686,934 <br />