Laserfiche WebLink
BLASTING MATERIALS QUANTITIES <br />181016 <br />11 <br />LE <br />Total Quantity ofdet. cord/fuse/wire Required: 56,815 <br />linear feet <br />Quantity ofBlasting Caps perBlasthole: 1 <br />cap(s ) <br />Total Quantity ofBIasting Caps Reuired: 650 <br />caps <br />Quantity ofPrimers erBlasthole: 1 <br />primer(s) <br />Total Quantity ofPrimers Required: 650 <br />primers <br />Quantity ofDela s erBlasthole: 1 <br />dela (s <br />Total Quantity ofDela s Required: 655 <br />delays <br />HOURLY EQUIPMENT COST Shift basis: Iper day <br />Description <br />Drilling Equipment - Drill: <br />-Drill Pad Preparation: <br />Atlas Capco DML/SP - 9-7/8" <br />CatDllT - 116 <br />NA <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />NA <br />NA <br />$4.42 <br />Explosives Delivery -Bulk Truck: <br />-Ca Truck: <br />ANFO Bulk Delivery Truck <br />Map Delivery Truck <br />$183.90 <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauipment Preparation Support Support Bulk Truck Can Truck <br />Totalworkteam cost/hour: $1.027.79 <br />MATERIALS COST <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />MiscTruck <br />MiscTruck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />100 <br />100 <br />Ownership cost/hour: <br />$111.89 <br />$226.13 <br />NA <br />NA <br />$74.07 <br />$4.42 <br />Operating cost/hour: <br />$139.31 <br />$183.90 <br />NA <br />NA <br />$108.79 <br />$21.64 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$57.25 <br />$41.85 <br />NA <br />NA <br />$29.27 <br />$29.27 <br />Unit Subtotals: <br />$308.45 <br />$451.88 <br />$0.00 <br />$0.00 <br />$212.13 <br />$55.33 <br />NumberofUnits: <br />1 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$308.45 <br />$451.88 <br />$0.00 <br />$0.00 <br />$212.13 <br />$55.33 <br />Totalworkteam cost/hour: $1.027.79 <br />MATERIALS COST <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />( 7,900-15,000 fps) <br />Pound <br />$0.239 <br />376420.236 <br />$89,964.44 <br />Castprimer, 1.0 lb <br />(electric or non -electric <br />Primers or Boosters: <br />system) <br />Each <br />$3.370 <br />650.000 <br />$2,190.50 <br />Non -electric cap, delay <br />Blasting Caps: <br />(non -electric systems) <br />Each <br />$3.569 <br />650.000 <br />$2,319.85 <br />Detonating cord, 25 <br />Det. Cord, fuse, or <br />gr./ft. (non -electric <br />wire: <br />systems) <br />Linear foot <br />$0.143 <br />56815.000 <br />$8,124.55 <br />MS connectors (non - <br />Delays: <br />electrics stems) <br />Each <br />$7.850 <br />655.000 <br />$5,141.75 <br />Stenining, 1.5 in. gravel <br />(inert blasthole packing - <br />Miscellaneous: <br />imported) <br />Cu. yd. <br />$27.808 <br />458.150 <br />$12,740.23 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,738.47 <br />20.911 <br />$57,265.32 <br />