My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-26_REPORT - C1981019
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2022-04-26_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 5:52:44 PM
Creation date
4/26/2022 5:50:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/26/2022
Doc Name
Annual Reclamation Report Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Annual Report Year
2021
Permit Index Doc Type
Annual Reclamation Report
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> \/ Division of Reclamation, <br /> ® Mining and Safety <br /> Department of Natural Resources <br /> April 26,2022 <br /> Tony Tennyson <br /> Colowyo Coal Company L.P. <br /> 5731 State Highway 13 <br /> Meeker,CO 81641 <br /> Re: Colowyo Coal Mine(Permit No. C-1981-019) <br /> 2021 Annual Reclamation Report(ARR)Review <br /> Dear Mr.Tennyson: <br /> The Colorado Division of Reclamation,Mining and Safety(the Division)has reviewed the 2021 ARR for <br /> the Colowyo Mine (Colowyo)in the context of Rule 2.04.13 (Regulations of the Colorado Mined Land <br /> Reclamation Board for Coal Mining),Colowyo's approved PAP and previous Colowyo ARRs. The <br /> Division has the following comments: <br /> When reviewing the 2021 ARR Report Form(Figure 2-1 in Colowyo 2021 ARR), there appears to be <br /> some discrepancies in the acreages reported. <br /> 1. The sum of the cumulative total for Acreage in Active Mining Areas,Acres Backfilled and <br /> Graded, and Totals for Acreage in Long-term Facilities does not match the Acres Disturbed. The <br /> sum of these acres must match the cumulative total for Acres Disturbed and currently there is a <br /> discrepancy of 97.4 acres. The four reported numbers need to be updated to accurately report and <br /> reflect the cumulative totals in the 2021 ARR Report Form. Please see Figure 1 at the end of this <br /> document for additional clarification. <br /> 2. Based on the Division's Findings Documents for all approved bond release applications (SL-1 <br /> through SL-20),the reported acreages in the 2021 ARR Report Form for Phase I,Phase II and <br /> Phase III Bond Releases appear incorrect. Please update the acreages for Bond Releases to report <br /> all acreages released for their associated phases for the entire Colowyo life of mine. Please see <br /> Table 1 at the end of this document for the Division's documented acreages for approved Phase I, <br /> Phase II and Phase III Bond Releases. <br /> If you have any questions,feel free to contact me. <br /> Sincerely, <br /> Zach Trujillo <br /> Environmental Protection Specialist <br /> flF'�010 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director * 1876 * <br />
The URL can be used to link to this page
Your browser does not support the video tag.