My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-09_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-08-09_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 7:19:26 PM
Creation date
4/26/2022 2:58:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/9/2021
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-49 Revision Date: 7/20/21 <br /> Revision No.: MR-235 <br />4.16 POSTMINING LAND USE <br /> <br />4.16.1 General <br /> <br />Implementation of the detailed reclamation plan as presented in Section 2.05.5 will result in a <br />landscape and vegetative cover that is equal to or better than the premining condition for rangeland <br />use that currently exists in the area. <br /> <br />4.16.2 Determining Use of Land <br /> <br />The premining land uses for the mine plan and adjacent areas are shown on the Land Use Map <br />(Map 17). The narrative describing the land use of the permit area is presented under Section <br />2.04.3. The proposed postmining land use will involve the restoration of the premining land use <br />of rangeland, as described in Section 2.05.5. <br /> <br />4.16.3 Prior to Release of Lands from the Permit Area in Accordance with 3.03.1 (2) (c) <br /> <br />The land use of rangeland will be restored in a timely manner as outlined in Section 2.05.4. <br />Implementation of the timetables contained therein will assure a contemporaneous reclamation <br />program. No alternative land uses will be implemented in the reclamation plan set forth under <br />Section 2.05.4. <br /> <br />4.17 AIR RESOURCES PROTECTION <br /> <br />Colowyo employs fugitive dust control measures in all phases of the mining and reclamation <br />activities. The control measures currently used are set forth in detail in Section 2.05.6. <br /> <br />The operations at Colowyo are presently regulated under numerous emission permits issued by the <br />Colorado Department of Health, Air Pollution Control Division. Section 2.03.10 identifies the <br />various permits under which Colowyo currently operates. The permits are set forth in Exhibit 8, <br />Air Quality Information. <br /> <br />4.18 PROTECTION OF FISH, WILDLIFE, AND RELATED ENVIRONMENTAL <br />VALUES <br /> <br />As described in Section 2.04.11, no threatened or endangered species have been identified within <br />the active mining operation. Also, no critical habitat for any species is known to exist. Golden <br />Eagle nesting complexes, which are located within the permit area but outside the area to be mined, <br />are described in Section 2.04.11. <br /> <br />Electric power lines and other transmission facilities in the permit area will be constructed in <br />accordance with the guidelines set forth in the environmental criteria for Electric Transmission <br />System by the United States Department of Interior (USDI) and the United States Department of <br />Agriculture (USDA) 1970. Distribution power lines are to be constructed by guidelines set forth <br />in the Rural Electrification Administration (i.e., Rural Utilities Service) 1979 Bulletin 61-10 and <br />will suffice for Rural Utilities Service’s current construction guidelines for raptor-safe power line
The URL can be used to link to this page
Your browser does not support the video tag.