Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> Colowyo will not conduct blasting within 1000 feet of any building used as dwelling, school, <br /> church, hospital, or nursing facility; and 500 feet of facilities, including but not limited to <br /> petroleum or gas storage facilities, fluid transmission pipelines, gas or oil collection lines or water <br /> and sewage lines. Distances to various structures of possible concern surrounding the mining area <br /> are shown on the Blasting Analysis Map (Map 26A). <br /> By employing the design criteria to minimize air blast and ground vibration Colowyo will insure <br /> that flyrock, including blasting material traveling along the ground, will not be cast from the <br /> blasting vicinity, more than half the distance to a nearby dwelling or other occupied structure and <br /> in no case beyond the line of property owned or leased by the Company or beyond the area of <br /> regulated access required under Subsection 4.08.4(5). The minimization of flyrock is also <br /> important and routinely monitored in order to reduce damage to mining equipment. <br /> 4.08.2 Pre-Blasting Survey <br /> Upon request to the Division by a resident or owner of a dwelling or structure located within one- <br /> half mile of any part of the permit area, Colowyo will promptly conduct a pre-blasting survey. A <br /> copy of correspondence advising our neighbors of this. opportunity is provided in Exhibit 14 - <br /> Seismograph Measurements, Item 2. A report of the survey will be submitted to the Division and <br /> to the person requesting the survey. The pre-blasting survey will assess the condition of the <br /> structure or dwelling and document any pre-blasting damage, including any physical factors which <br /> might be reasonably affected by blasting. Such a survey will determine only the surface condition <br /> of pipes,cables,transmission lines, wells and other water systems;however, special attention will <br /> be given to the pre-blasting conditions of wells and other water systems used for human, animal <br /> or agricultural purposes and to the quantity and quality of that water. <br /> A written report of any pre-blasting survey will be prepared and signed by the person conducting <br /> the survey. This report will include any proposed adjustments to the blasting program which might <br /> be necessary to be incorporated or should be incorporated to prevent damage. A copy of the report <br /> will be provided to the person requesting the survey and to the Division. For properties owned by <br /> Colowyo, a pre-blast survey will not be necessary. <br /> In a report dated February 19, 1991 Colowyo initiated and reported on a Building Condition <br /> Inspection of the Durham Ranch. Although the Durham ranch was located further than one-half <br /> mile from the Permit Boundary at that time (approximately 4200 feet) the inspection was <br /> nevertheless completed. The Durham Ranch residents were also presented with a copy of the <br /> report. On May 20, 1997 an additional copy of the report was presented to the Durhams and also <br /> a copy forwarded to the Division. A copy of the May 20, 1997 letter can be found in Exhibit 14 - <br /> Seismograph Measurements. <br /> 4.08.3 Public Notice of Blasting Schedule <br /> The blasting program at the Colowyo operation will involve the detonation of more than five <br /> pounds of explosives or blasting agent in all blasts. Colowyo will annually publish a blasting <br /> schedule in the local Craig newspaper. A typical blasting schedule published in the local <br /> newspaper is set forth in Section 2.05, Figure 2.05-1, Publication of Blasting Schedule. <br /> Rule 4 Performance Standards 4-25 Revision Date: 12/20/19 <br /> Revision No.: TR-135 <br />