Laserfiche WebLink
Exhibit E — Reclamation Plan <br /> 1 . General Reclamation Plan <br /> The Cottonwood Pass Pit permit area is 16.9 acres, approximately 15.0 acres of which is disturbed. <br /> The reclamation of the site will consist of leaving it in its current state. The site currently has a site <br /> access road from Cottonwood Pass Road, an in-pit ramp, and multiple materials stockpiles. All <br /> slopes are between a 2H:1V and 3H:1V. The stockpiles, road, and slopes will remain on site in their <br /> current condition. Based on these reclamation conditions, the Cottonwood Pass Pit is fully <br /> reclaimed in its present conditions. <br /> 2. Topsoil Replacement <br /> No topsoil replacement will take place. <br /> 3. Site Access <br /> The current site access from Cottonwood Pass will be maintained in its current condition to facilitate <br /> access for the landowner. <br /> 4. Reclamation Timing <br /> As the site is reclaimed in its current condition, no additional time is needed. <br /> 5. Revegetation Plan <br /> No revegetation will take place. <br /> 6. Post-Reclamation Site Drainage <br /> The site will drain internally following reclamation. See Map F-1 for the drainage patterns. <br /> 7. Weed Control <br /> No weed control will take place. <br /> Cottonwood Pass Pit <br /> Apri12r�22 D-1 Le�ai�lii i#A�§�tiatE§ <br />