My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-25_REVISION - M2017025 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017025
>
2022-04-25_REVISION - M2017025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 8:36:08 PM
Creation date
4/26/2022 8:17:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017025
IBM Index Class Name
Revision
Doc Date
4/25/2022
Doc Name
Request for Technical Revision
From
Lewicki & Associates
To
DRMS
Type & Sequence
TR1
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E — Reclamation Plan <br /> 1 . General Reclamation Plan <br /> The Cottonwood Pass Pit permit area is 16.9 acres, approximately 15.0 acres of which is disturbed. <br /> The reclamation of the site will consist of leaving it in its current state. The site currently has a site <br /> access road from Cottonwood Pass Road, an in-pit ramp, and multiple materials stockpiles. All <br /> slopes are between a 2H:1V and 3H:1V. The stockpiles, road, and slopes will remain on site in their <br /> current condition. Based on these reclamation conditions, the Cottonwood Pass Pit is fully <br /> reclaimed in its present conditions. <br /> 2. Topsoil Replacement <br /> No topsoil replacement will take place. <br /> 3. Site Access <br /> The current site access from Cottonwood Pass will be maintained in its current condition to facilitate <br /> access for the landowner. <br /> 4. Reclamation Timing <br /> As the site is reclaimed in its current condition, no additional time is needed. <br /> 5. Revegetation Plan <br /> No revegetation will take place. <br /> 6. Post-Reclamation Site Drainage <br /> The site will drain internally following reclamation. See Map F-1 for the drainage patterns. <br /> 7. Weed Control <br /> No weed control will take place. <br /> Cottonwood Pass Pit <br /> Apri12r�22 D-1 Le�ai�lii i#A�§�tiatE§ <br />
The URL can be used to link to this page
Your browser does not support the video tag.