Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> <br />Collom – Rule 4, Page 12 Revision Date: 6/2/21 <br /> Revision No.: TR-148 <br />Groundwater Fill Piezometers - Monitoring of the West Pit fill piezometer and Section 16 Fill piezometer <br />have been discontinued. The West Pit Fill and West Taylor Fill piezometers will be monitored quarterly <br />for water levels. One additional piezometers will be installed into the toe of East Taylor Fill, once <br />constructed, as described in Exhibit 21 Item 1. <br /> <br />A future spoil water monitoring well will be drilled (and water quality monitored) as identified on Map <br />41B in the reclaimed Collom Pit area to monitor and measure the potential development of a spoil aquifer. <br />This location represents the lowest point in the Collom Pit. <br />4.05.14 Transfer of Wells <br /> <br />Please see Section 4.05.14 in Volume 1. <br />4.05.15 Water Rights and Replacment <br /> <br />Please see Section 4.05.14 in Volume 1 and Section 2.04.7(2) in Volume 15. <br />4.05.16 Dischrage of Water into an Underground Mine <br /> <br />This section is not applicable to the Collom Mine. <br />4.05.17 Postmining and Rehabilitation of Sediment Pond, Diversions, Impoundments, and <br />Treatment Facilities <br /> <br />Please see Section 4.05.17 in Volume 1. <br />4.05.18 Stream Buffer Zones <br /> <br />Lands within 100 feet, or greater distance if required, of a perennial, an intermittent, or an ephemeral <br />stream with a drainage area larger than one square mile are required to be protected under Rule 4.05.18, <br />unless the Division specifically authorizes surface operations within the stream buffer zone. Stream <br />buffer zones have been identified along Wilson Creek and Jubb Creek, as the drainage area reporting to <br />these streams is larger than one square mile. Colowyo will be developing the Collom Haul Road which <br />will be inside the stream buffer zone on both Wilson Creek and Jubb Creek. <br /> <br />The Collom Haul Road will cross Wilson Creek as shown on Map 25E Sheet 1. During construction <br />Colowyo will install a round culvert, and will employ proper best management practices (BMPs) during <br />the construction phase in accordance with Colowyo’s approved stormwater management plan, Section <br />401 certification, and US Army Corps 404 permit.. <br /> <br />The Collom Haul Road will also cross Jubb Creek as shown on Map 25E Sheet 1. The construction of the <br />crossing will be similar to the Wilson Creek crossing and will utilize the same BMPs as will be installed <br />at the Wilson Creek crossing. <br /> <br />As shown on Map 25E Sheet 1, the Collom Haul Road will parallel Jubb Creek. There will be one <br />section of the haul road that will be slighty within 100 feet of the stream. As shown on Map 25E Sheet 1, <br />at approximately Station 230+00 to 250+00 there will a slight amount of disturbance within the stream <br />buffer zone on Jubb Creek. Proper BMPs will be employed prior to any disturbance occurring within <br />this area and once the road construction is complete any areas that can be reclaimed will be completed as <br />soon as possible.