My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-21_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-07-21_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 3:03:51 PM
Creation date
4/25/2022 4:57:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/21/2021
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-21 Revision Date: 12/21/20 <br /> Revision No.: TR-143 <br />left in place after reclamation until a suitable vegetative cover has been achieved. The water <br />pipe line and associated infrastructure will not create any long term impacts to Taylor Creek. <br /> <br />For a discussion on stream buffer zones from Wilson Creek, Jubb Creek, and Little Collom Gulch <br />please see Volume 15, Section 4.05.18. <br /> <br />4.06 TOPSOIL <br /> <br />4.06.1 General Requirements <br /> <br />Before the disturbance of any area, topsoil is removed and segregated from other material. Upon <br />removal, this material is either immediately redistributed on regraded areas or stockpiled in <br />locations shown on the Topsoil Handling Maps 28 and 28A. <br /> <br />4.06.2 Removal <br /> <br />All topsoil, as classified in section 2.04.9, is removed from areas to be affected by the surface coal <br />mining operations. The graphical representation of the topsoil removal is shown on the Topsoil <br />Handling Map (Map 28 and 28A). This map has been greatly simplified from that of the original <br />application to reflect actual on-the-ground operations. The techniques for removal of woody plant <br />materials that otherwise would interfere with the usefulness of the topsoil is discussed in Section <br />2.05.3 <br /> <br />Removal techniques for topsoil are described in Section 2.05.3. <br /> <br />A variance from topsoil removal was requested and approved by the Colorado Division of <br />Reclamation, Mining and Safety for the following areas; construction of small structures such as <br />power poles, signs or fence lines, areas of light traffic that do not destroy existing vegetation or <br />cause erosion and areas where removal would result in needless damage to soil characteristics such <br />as sediment control ditches and small water diversions. In most cases, especially on steep slopes, <br />removal of topsoil prior to ditch construction needlessly damages large areas of topsoil, along with <br />the adjacent natural vegetation. Implementation of the technique of cutting the ditches directly into <br />the hillside without topsoil removal will limit needless topsoil disturbance, reduce unnecessary <br />destruction of adjacent vegetation and will facilitate reclamation of the ditches at a future date. <br /> <br />It should also be clarified that consistent with Map 6, Soils – South and Exhibit 9, Volume 19, <br />there will be small areas of rock outcrop, rocky steep slopes, etc. where the topsoil depth is 0 <br />inches. Where this occurs there will not be an attempt to recover topsoil or otherwise disturb the <br />area before disturbance by mining. <br /> <br />Colowyo does not plan to use overburden material for topsoil substitutes or as a supplement to <br />topsoil. Colowyo will remove topsoil before any mining operations commence and always <br />maintain a buffer zone between the area stripped of topsoil and the overburden drilling and blasting <br />operations.. As depicted on the Topsoil Handling Map (Map 28 & 28C), the topsoil handling <br />program will result in an orderly sequence for the continuous removal, storage or reapplication of <br />topsoil. The redistribution of topsoil will be done at a time when the physical and chemical
The URL can be used to link to this page
Your browser does not support the video tag.