Laserfiche WebLink
Point of Compliance Well Investigation <br /> <br /> <br /> <br />AECOM <br />14 <br /> <br />5. References <br />AECOM. (2018). Colowyo Mine Points of Compliance Evaluation. September. <br />Colorado Division of Reclamation, Mining and Safety. (2006). Interoffice Memorandum from <br />Mike Boulay to Jim Stark regarding Colowyo Mine (Permit no. C-81-019), Permit <br />Revision No. 2 (PR-02). <br />Colorado Division of Reclamation, Mining and Safety. (2006). Colowyo Mine C-1981-019 Permit <br />Revision 02 (PR-02) – South Taylor Baseline and Mine Plan and Lower Wilson Baseline <br />– Preliminary Adequacy Letter. <br />Colorado Division of Reclamation, Mining and Safety. (2007). Colowyo Mine C-1981-019 Permit <br />Revision 02 (PR-02) – South Taylor Baseline and Mine Plan and Lower Wilson Baseline <br />– Second Adequacy Letter. <br />Colorado Mined Land Reclamation Board. (1980 et seq.). Rules and Regulations of the <br />Colorado Mined Land Reclamation Board for Coal Mining. Department of Natural <br />Resources. <br />Colorado Water Quality Control Commission. (2020). Regulation No. 41 The Basic Standards <br />for Groundwater. Department of Public Health and Environment. <br />Colowyo Coal Company. (1981 et seq.). Colowyo Mine Permit Application C-1981-019. <br />Environmental Protection Agency (EPA). (2015). ProUCL Version 5.1 User Guide. <br />Petersen Hydrologic, LLC. (2015). Points of Compliance Evaluation for Alluvial Groundwaters in <br />the Taylor Wilson and Good Spring Creek Drainages at Colowyo Mine. Meeker, CO: <br />Colowyo Coal Company. <br />