Laserfiche WebLink
Truck Travel(Haul&Return)Time: Road Condition:Firm,smooth,rolliniz,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 3.00 3.00 6.00 1266 4.238 <br /> Haul Time: 4.238 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 -3.00 3.00 0.00 3503 1.672 <br /> Return Time: 1.672 minutes <br /> Total Truck Cycle Time: 9.390 minutes <br /> Loading Tool unit <br /> Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br /> Truck Unit Production <br /> 1,117.62 LCY/Hour Adjusted for job efficiency: 927.62 LCY/Hour <br /> Optimal No.of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 3,710.50 LCY/Hour <br /> Adjusted single truck/loader team production: 3,710.50 LCY/Hour <br /> Adjusted multiple truck/loader team production: 3,710.50 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 53.62 Hours <br /> Unit cost: $1.347 /LCY Total job cost: $267,906 <br />