Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Replace Topsoil and Reseed Collom Disturbance <br /> Site: Colowyo Coal Mine Permit Action: MR240 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4/25/2022 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Topsoil from 25A TRUCKI 1 53.62 $267,906 <br /> 002 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 66.00 $75,846 <br /> SUBTOTALS: 119.62 $343,752 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $6,944 <br /> Performance bond: 1.05 Total= $3,609 <br /> Job superintendent: 59.81 Total= $4,308 <br /> Profit: 10.00 Total= $34,375 <br /> TOTAL O&P= $49,236 <br /> CONTRACT AMOUNT(direct+O&P)= $392,988 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $7,860 <br /> Reclamation management and/or administration: 1.91 $7,506 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $64,602 <br /> TOTAL BOND AMOUNT(direct+indirect)= $408,354 <br />