Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use check one): <br /> Cropland(CR) X Pastureland(PL) -E] General Agriculture(GA) <br /> Rangeland(RL) -E] Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) _0 Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> 0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> JZ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): Area will be mined using front <br /> end loaders, dozers and excavators and moved to the processing plant <br /> 15. On Site Processing: E Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Topsoil and overburden will be stockpiled <br /> for reclamation and gravel material will be processed into specific products <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> The amendment request is to expand the permit boundries in all directions <br /> from the current 15 acres of mining area to a total of approx. 36. 74 acres <br /> of mining area . The current pit is nearing the end of its resources avail— <br /> able for processing so additional acreage is needed in order to continue <br /> operations . <br />