My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-25_PERMIT FILE - M2022019
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022019
>
2022-04-25_PERMIT FILE - M2022019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 9:34:31 AM
Creation date
4/25/2022 9:35:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022019
IBM Index Class Name
Permit File
Doc Date
4/25/2022
Doc Name
Application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No pit dewatering will take place, as the groundwater table is well below the planned bottom of <br /> the pit. No groundwater exposure will take place. See Exhibit G for full water information for the <br /> operation. <br /> 1.1 . San Miguel County Property Line Berm Mining <br /> Adjacent to the west is a San Miguel County sand and gravel pit. United Companies will <br /> eventually mine to the property line. Prior to mining within 100 feet of the western property line, <br /> United Companies will provide an agreement with San Miguel County for mutual mining of the <br /> separating berm. This agreement will be provided in a technical revision to CDRMS. <br /> 2. Mining Timetable <br /> Table D-1 Mining Timetable <br /> Activity Time <br /> 1P�IaI st�i �/�/ Ffrsti f Year 1 ... <br /> Mining of first 13 acre half of pit Years 1-13 <br /> The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br /> mining is undertaken. Note: If large contracts are awarded to the site, production could increase <br /> to the permit maximum, thereby curtailing the life of the pit. On the other hand, if contracts are <br /> less than anticipated, the life of the pit could be extended. This table is based on a reasonable <br /> projection of average production rates. <br /> 3. Mine Facilities and Operation <br /> The site will contain the following facilities. There are no portable or permanent facilities, as they <br /> are located in the United/Norwood Pit. The site will contain the following equipment. <br /> - Front-end loaders <br /> - Bulldozers <br /> - Scrapers <br /> - Haul trucks (off highway) <br /> No structures will be built within the mining area. <br /> Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br /> maintenance on vehicles and equipment. Any major repair work required will be performed off <br /> site. <br /> Skelton Pit <br /> January 2022 C-2 Lewicki&Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.