My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20_PERMIT FILE - M2021068
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021068
>
2022-04-20_PERMIT FILE - M2021068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:14:09 AM
Creation date
4/21/2022 11:19:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021068
IBM Index Class Name
Permit File
Doc Date
4/20/2022
Doc Name
Application
From
Jack D Tabb, LLC
To
DRMS
Email Name
MAC
AWA
BFB
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT F <br /> LIST of OTHER PERMITS and LICENSES REQUIRED <br /> 6.3.6 <br /> • A Gilpin County Permit for Mining Permit is required. Contact with the <br /> Planning and Zoning office has been made. <br /> • A highway Special Use permit may be required and would only apply to <br /> Truck Traffic, if necessary, on the Central City parkway in Gilpin and Clear <br /> Creek Counties. <br /> • A Portable Toilet will be brought to the site to comply with county <br /> regulations for on-site sanitation. <br /> • Trucks and other machinery are not required to be tested for emissions in <br /> Gilpin County.JACK D TABB, U.C, will contract out the maintenance for said <br /> equipment. <br /> • County road weights and limits will not be exceeded. <br /> • The project will not require effluent discharge permits, dam construction or <br /> building permits, well permits, explosive permits, or state Historical <br /> Preservation Office clearance. <br /> • A Stormwater Permit will be obtained. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.