My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20_PERMIT FILE - M2021068
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021068
>
2022-04-20_PERMIT FILE - M2021068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:14:09 AM
Creation date
4/21/2022 11:19:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021068
IBM Index Class Name
Permit File
Doc Date
4/20/2022
Doc Name
Application
From
Jack D Tabb, LLC
To
DRMS
Email Name
MAC
AWA
BFB
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re-graLion Plan JACK p TABB1 LLC. <br /> E Re-grade & Revegetate <br /> [late: February Proper <br /> .inns GUNNELL MINE RECLAMATION 1615 prase, t. <br /> Sat Hybrid, Property Lines 1615Sara;.aga5t. <br /> Andso,w1 S4409 <br /> A Phone:715.610.2402 <br /> � Reclamation Plan <br /> .. Silt Fence <br /> Before applying the newly placed <br /> a A ecte Area topsoil,a pH treatment utilizing <br /> . hydrated lime shall be broadest <br /> Former Dump Site ' on any areas previously impacted <br /> by the removed waste rock. The <br /> lime shall be broadest at a rare of <br /> 5.0 pounds per 1,000 square feet <br /> of such Impacted area. once <br /> Wooft broadcast,a light spray of water <br /> shall be applied over the same. <br /> County Rd This will sufficiently neutralize any <br /> trace, potentially acid forming <br /> • `ii <br /> material left he.-hind. <br /> AW <br /> Perimeter Imported topsoil shall be applied <br /> 5ih Fence ing Entrance <br /> over the underlying area exposes! <br /> M <br /> 105.52383 by removal of dump material for a <br /> minimum depth of 6 inches.in <br /> . r <br /> order to improve the soils water <br /> holding capacity, organic matter <br /> will be added to the soil.After <br /> " seeding,the NCRS strongly <br /> recommens the application of <br /> straw covere by netting. (2t per <br /> acre)Temperary erosion control <br /> measures(ie silt fence, stray., <br /> bales) will also be implemented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.