Laserfiche WebLink
comply with the performance standards of Section 3.1 and this operation is not intended to <br /> be an intermittent operation as defined in Section 34-32.5-103(11)(b), C.R.S. <br /> Reclamation and mining will be conducted concurrently when practicable to minimize <br /> disturbance and material handling. See the Mining Plan Map in Exhibit C for Cells and <br /> phases to be mined. <br /> 6.6 Deposit <br /> As described in Sub-section 6.4.4(f) of the Rules and Regulations, narrative and figures <br /> are provided in this section to describe the deposit. Figurel provides a generalized <br /> cross-section of the deposit. <br /> The deposit to be mined is the Big Thompson River alluvium, which consist of <br /> unconsolidated silt, sand, and gravels. The deposit ranges from approximately 25 to 28 <br /> feet thick and is overlain by approximately 1 to 2 feet of sandy to clay loam topsoil. A <br /> conceptual cross-section though the site is shown in Figure 1. <br /> The stratum below the target deposit consists of a weathered shale bedrock. <br /> 6.7 Commodities <br /> Sub-section 6.4.4(g) of the Rules and Regulations requires that the applicant identify the <br /> primary and secondary commodities to be mined/extracted and describe the intended use. <br /> The primary commodities to be mined are gravel, sand, and fill. The material will be used <br /> as aggregate in concrete and construction materials. <br /> 6.8 Incidental Products <br /> LRM does not plan to produce any incidental products, and thus,there is no information to <br /> report under Sub-section 6.4.4(h) of the Rules and Regulations. <br /> Loveland Ready-Mix,Concrete,Inc. 10 September 2021 <br /> updated_e<hibn,_d_220415 docz T E L E S T <br />