My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20_PERMIT FILE - M2021059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-04-20_PERMIT FILE - M2021059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 8:52:31 PM
Creation date
4/20/2022 9:15:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
4/20/2022
Doc Name
Adequacy Review Response #3
From
Telesto Solutions Incorporated
To
DRMS
Email Name
PSH
JLE
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 EXHIBIT D — MINING PLAN (UPDATED 4/15/22) <br /> This exhibit provides the information required by Section 6.4.4 of the Rules and <br /> Regulations. <br /> 6.1 Mining Methods and Surface Disturbance <br /> Section 6.1 provides the information required in Sub-section 6.4.4(a) Rules and <br /> Regulations. <br /> The entire site consists of approximately 114.25 acres. There are approximately 76 acres <br /> that LRM will utilize for mining. Approximately 38 acres of the site will consist of <br /> boundary offsets, perimeter buffering the main access road, the Big Thompson River <br /> corridor, and stormwater management areas. <br /> 6.1.1 Site Preparation <br /> The site will first be cleared of unneeded existing structures(old fencing and cattle chutes). <br /> The topsoil,if present,material will be stripped as each Cell is mined. Stripping will occur <br /> in phases or"strips" approximately 1/81h to 1/4th of the size of the Cell to expose the active <br /> mining area. The stripped material will be stockpiled adjacent to the active mining area. <br /> Scrapers, front-end loaders, excavators, and bulldozers may be used for stripping. Topsoil <br /> stockpiles, ditches and grading may be used to direct stormwater into the mining cells. <br /> Exhibit C shows the quantities of topsoil for each phase. A typical topsoil stockpile berm <br /> size will be 36 feet in width, 10 foot high, or 6.6 sq-yd per ft. The topsoil stockpiles will <br /> be stabilized, and erosion control devices will be installed. If the topsoil stockpiles will be <br /> in place for 180 days LRM will seed to produce a vegetated cover. <br /> An access bridge across the Big Thompson River will require a 404 Permit to construct. <br /> As part of the 404 Permit the bridge will be installed and analyzed to certify that it does <br /> not create a rise in the floodway. Haul roads will be established and stabilized during site <br /> preparation. <br /> Loveland Ready-Mix,Concrete,Inc. 6 September 2021 <br /> upd.wd_c,Nbn,_d_220415 do- T E L E S T <br />
The URL can be used to link to this page
Your browser does not support the video tag.