My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-19_REVISION - M1981044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981044
>
2022-04-19_REVISION - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2022 2:56:48 PM
Creation date
4/19/2022 2:36:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Revision
Doc Date
4/19/2022
Doc Name
Adequacy Review Response #2
From
Pioneer
To
DRMS
Type & Sequence
AM3
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALEY&ALDRICH,INC. <br /> 'CH 8101 E. Prentice Avenue <br /> Suite 600 <br /> H2ER Greenwood Village,CO 80111 <br /> 720.616.4400 <br /> CLIENT MEMORANDUM <br /> 24 February 2022 <br /> File No. 0204990-001 <br /> TO: Pioneer Landscaping Materials, Inc. <br /> Dr. Angela M. Bellantoni <br /> FROM: Haley&Aldrich, Inc. <br /> Zachary J. Smith <br /> Senior Engineer <br /> Chris G. Langham P.E.(AZ), CFM <br /> Senior Technical Specialist <br /> SUBJECT: Solberg Gravel, LLC Permit Structure Agreement for above ground Mountain Valley <br /> Electric utilities located along the west boundary <br /> Mountain Valley Electric have utilities located along the West boundary of the proposed Solberg Mine <br /> expansion on above ground poles. As part of the Permit for the Solberg Mine, a structure agreement is <br /> required for structures within 200 feet of the permit boundary.The above ground utilities lie within 200 <br /> feet of the permit boundary. <br /> The utility poles are located along a common access driveway to the west of the proposed amendment <br /> area. All slopes within a 200 foot radius of the above ground utility will have a slope no steeper than <br /> 3H:1V (horizontal:vertical).This will be done to ensure there will always be an effective slope no steeper <br /> than 3H:1V between the structure of interest and the toe of an excavation. <br /> If you have any questions, please feel free to contact me at 303.621.6536 or email <br /> ZSmith@haleyaldrich.com. <br /> \\haleyaldrich.com\share\CF\Projects\0204990\Work_Processing\0204990-STRUCTURAL-STATEMENT-Mountain Valley Electric.docx <br /> www.haleyaldrich.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.