Laserfiche WebLink
1 <br /> �� � BATTLE MOUNTAIN RESOURCES, INC. <br /> I � ����L�,�a� <br /> �U �4 � � <br /> April 13, 2022 � m� <br /> �p� � g 20Z2 <br /> I Mr. Lucas West pF R��ta��q�T�AN� <br /> �i:V;31Ct� r��Y_N'ilP1E <br /> j Colorado Division of Reclamation, Mining and Safety Mj��;�'G&SA <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> II Re:San Luis Project Tailing Dam Q1 2022 Inspection Report,Technical Revision No. 33, Permit No. M-1988-112 <br /> I' Dear Mr.West: <br /> Battle Mountain Resources Inc.(BMRI)is pleased to provide the Q1 2022 San Luis Tailing Dam Inspection Report in <br /> ' accordance with Technical Revision No.33 to BMRI's Reclamation Permit. <br /> The Inspection was conducted by BMRI Site Manager Mr. David Carino and Operator Mr.Aaron Taylor. <br /> Enclosed with the inspection report are photos of the Tailing Impoundment facilities to include the drop structure <br /> and the under-drain discharge area.Also included are the Ql 2022 Piezometer Inspection results. <br /> R spectfuily, <br /> '� � <br /> Ju io F. Madrid <br /> Sr.Supervisor Colorado Legacy Sites <br /> (719)379-0538 <br /> cc: Devon Horntvedt <br /> David Carino <br /> P.O. Box 3]0 • San Luis,Colorado 81 I 52-03]0 • (719)379-0798 • Fax(719)379-0713 <br />