Laserfiche WebLink
March 15,2022 C-1981-012/New Elk Mine JLE <br /> y <br /> �t <br /> dln <br /> �„ 9 : <br /> P <br /> Figure 8. From the east end of the RDA looking west. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> As indicated in the hydrologic balance section of the report,a pump house is constructed southwest of the foot <br /> bridge #1 west of the pump vault. This pump house is not shown on Map II-Sheet 3, or the Map 11 -East <br /> Portal Sediment and Surface Water Control Map and is not discussed in permit section 2.05 of the PAP. <br /> NECC will need to submit a Minor Revision to depict this facility on these maps and update permit section <br /> 2.05 to comply with Rule 2.05.3(3)for the construction and use of the pump house. <br /> DOCUMENTS RECEIVED-None <br /> OTHER(SPECIFY) -None <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 8 of 9 <br />