Laserfiche WebLink
RULE 3 PERFORMANCE BOND <br /> RULE 3 - PERFORMANCE BOND <br /> The performance bond calculations for the entire Colowyo mining operation can be found in Exhibit 13A <br /> in Volume 13. The cumulative bond schedule for the Collom mining area can be found Exhibit 13C in <br /> Volume 20. The Bond Calculation Maps showing the Worst Case Topography and Regraded <br /> Topography are included as Map 35A and Map 36A, respectively. Bond Calculation Cross Sections are <br /> provided on Map 40A. <br /> South Taylor/Lower Wilson—Rule 3,Page 1 Revision Date: 4/14/22 <br /> Revision No.: RN-08 <br />