My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2022-04-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:08:54 PM
Creation date
4/15/2022 3:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/14/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
RN8
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#E01 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Topsoil B-Pit(PII release Parcle 31,32,&33) <br /> Site: Keenesburg Strip Mine Permit Action: RN8 Permit/Job#: C1981028 <br /> PROJECT IDENTIFICATION <br /> Task#: E01 State: Colorado Abbreviation: None <br /> Date: 7/13/2021 County: Weld Filename: C28-E01 <br /> User: RDZ <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D9T-9SU <br /> -Dump Area: Cat D9T-9SU <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 100 25 25 <br /> Ownership cost/hour: $223.48 NA $126.01 $126.01 $85.80 $17.15 <br /> Operating cost/hour: $193.77 NA $141.41 $141.41 $15.10 $7.30 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $47.07 NA $40.04 $40.04 $46.87 $38.91 <br /> Unit Subtotals: $464.32 NA $307.46 $307.46 $147.77 $63.36 <br /> Number of Units: 4 0 1 1 1 1 <br /> Group Subtotals: Work: $1,857.28 Support: $614.92 Maint: $211.13 <br /> Total work team cost/hour: $2,683.33 <br /> MATERIAL QUANTITIES <br /> Initial volume: 76,343 CCY Swell factor: 1.060 <br /> Loose volume: 80,924 LCY <br /> Source of estimated volume: Est.B-Pit Area,SL10 parcels removed <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,850 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Sand-Damp Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 28.63 LCY Adjusted Capacity: 28.63 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.