My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2022-04-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:08:54 PM
Creation date
4/15/2022 3:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/14/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
RN8
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Roads -Rule 4.03 <br /> Haul Roads <br /> Hauling of coal, spoil, and coal mine waste has been terminated at the Keenesburg Mine, and <br /> there are no plans to resume these activities. Ash importation into the mine ceased in April <br /> 2016. Haul roads at the site have been re-classified as Access Roads [Rule 4.03.1]. <br /> Access Roads <br /> Access roads have been designed, constructed, and certified by a registered professional engineer <br /> [Rule 4.03.2(1)(d)]. <br /> Light Use Roads <br /> Light use roads have been designed and constructed in accordance with Rule 4.03.3(7). Some <br /> light use roads are permitted to be left in support of approved post-mining land use. <br /> IV. Support Facilities -Rule 4.04 <br /> No new support facilities are anticipated on the site. The construction of existing support <br /> facilities has not damaged or caused disruption of any pipelines,railroads, or utility lines that <br /> pass over,under, or through the permit area. The Division approved the existing facilities [Rule <br /> 4.04(6)]. <br /> Several gas wells have been installed within the permit area by third parties. The gas companies <br /> maintain these well sites and access to the wells. These locations have been classified as <br /> industrial land use. Reclamation of the well sites is the responsibility of the gas companies, and <br /> this responsibility is stated in the contracts between them and CEC. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.