My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-08_PERMIT FILE - C1981044 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981044
>
2022-04-08_PERMIT FILE - C1981044 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 3:01:51 PM
Creation date
4/13/2022 2:57:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
4/8/2022
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MT8 2.05-31.1 Revised 02/28/22 <br />The first step, as in all reclamation activities, was the removal of all-surface structures and facilities. This will include <br />the electrical substation; chemical feed station, and borehole surface casing and enclosures. These structures and <br />facilities will be removed from the site and salvaged or scrapped. <br /> <br />The pumps will be pulled from the dewatering boreholes and all piping was removed from the ponds. The boreholes <br />will be plugged and sealed, consistent with the requirements of Rule 4.07, Sealing of Drill Holes and Underground <br />Openings, and in compliance with applicable State Engineer requirements. The ponds were dried out, and then the pond <br />embankments were pushed in to backfill the pond basins. . <br /> <br />The access road leading to the site will be retained as permanent to allow access to the Williams Fork River. This access <br />may be used for access to the river for the use of water rights for irrigation post mining for the hay cropland. <br /> <br />Stockpiled soil material was redistributed to a depth of 6 to 12 inches over the entire reclaimed area. After redistribution <br />of the soil, the material was analyzed to determine if any amendments are necessary. Reclaimed areas were seeded with <br />a cover crop and then the pastureland/hay cropland seed mixture. A drill was used for seeding. Given the proximity of <br />the facilities to the Williams Fork River, it is possible that reclamation may affect a small area of the adjacent <br />streambank. <br /> <br />Wastewater Treatment Facility <br /> <br />The wastewater treatment facility treated the effluent coming from the bathhouses, laboratory, offices, and shop. The <br />facilities are no longer needed, the treatment facility was reclaimed in 2018. <br /> <br />The first step in the reclamation process was to remove the surface structures. The surface structures include; fence, <br />blower building, control box for the lift station, and the control box for the flow meter. These facilities were salvaged <br />or scrapped. The next step was to remove all airlines and associated materials from the ponds. All fill material covering <br />the pond liner, the liner itself, and the retaining walls were removed. Finally, the chlorinator, manhole, all pumps, and <br />the support structure were removed and the area backfilled. The pond embankment material will be used as backfill. <br />Any excess embankment material was used to supplement backfilling operations at the facility areas. <br /> <br />The area was then topsoiled. The topsoil was redistributed to a depth of 6 inches over the area. Topsoil was analyzed <br />after placement and prior to seeding, and no immediate amendments were necessary. The area was seeded with a cover <br />crop and then the cropland hayland seed mixture. <br /> <br />Fresh Water System <br /> <br />The fresh water system is no longer needed to support the mining operations, the associated disturbed areas were <br />reclaimed. The overland water line was disassembled and removed from the site. The pipe and all fittings were salvaged <br />or scrapped. Minimal disturbance resulted from the removal of the line and there was no need for seeding. The wells <br />will remain as a permanent features (Wise Hill wells #5 & 5A) to benefit the postmining agriculture activities and aid <br />in property value. The storage tank was removed and scrapped. The area was then, re-topsoiled, planted with a cover <br />crop, and seeded with the hayland seed mixture.
The URL can be used to link to this page
Your browser does not support the video tag.