Laserfiche WebLink
Mr. Bill Tezak <br /> Apri18,2022 <br /> Page 7 of 11 <br /> You may wish to consult with a local NRCS office or equivalent to obtain a more appropriate <br /> rangeland seed mix and seeding rate for this area... <br /> (e)A plan or schedule indicating how and when reclamation will be implemented. Such plan or schedule <br /> shall not be tied to any specific date but shall be tied to implementation or completion of different stages <br /> of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br /> (i)An estimate of the periods of time which will be required for the various stages or phases of <br /> reclamation; <br /> (ii)A description of the size and location of each area to be reclaimed during each phase; and <br /> (iii)An outline of the sequence in which each stage or phase of reclamation will be carried out. <br /> (The schedule need not be separate and distinct from the Reclamation Plan,but may be <br /> incorporated therein.) <br /> (f)A description of each of the following: <br /> (i)Final grading - specify maximum anticipated slope gradient or expected ranges thereof, <br /> (ii) Seeding- specify types,mixtures, quantities,and expected time(s)of seeding and planting; <br /> (iii)Fertilization- if applicable, specify types,mixtures, quantities and time of application; <br /> (iv)Revegetation- specify types of trees, shrubs, etc., quantities, size and location;and <br /> (v)Topsoiling- specify anticipated minimum depth or range of depths for those areas where <br /> topsoil will be replaced. <br /> EXHIBIT F -Reclamation Plan May (Rule 6.4.6): The map(s)of the proposed affected land,by all phases of <br /> the total scope of the mining operation, shall indicate the following: <br /> (a)The expected physical appearance of the area of the affected land,correlated to the proposed mining and <br /> reclamation timetables. The map must show proposed topography of the area with contour lines of sufficient <br /> detail to portray the direction and rate of slope of all reclaimed lands; The provided reclamation map does not <br /> show sufficient detail for the proposed benching configuration,please address. Please provide updated cross <br /> sections in at least two locations/directions across the proposed final mine configuration showing the proposed <br /> bench configurations/dimensions,slopes and reclamation. <br /> (b)Portrayal of the proposed final land use for each portion of the affected lands. <br /> EXHIBIT G-Water Information (Rule 6.4.7): <br /> (1)If the operation is not expected to directly affect surface or groundwater systems, a statement of that <br /> expectation shall be submitted. Based on the submitted information,DRMS will require that groundwater not <br /> be exposed durinz minim and that any captured surface water runoff will be discharyed from the site within <br /> 72 hours—please acknowledze. <br /> (2)If the operation is expected to directly affect surface or groundwater systems,you shall: <br />