My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-28_REVISION - M2009035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009035
>
2022-03-28_REVISION - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 9:50:21 AM
Creation date
4/6/2022 1:45:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
Revision
Doc Date
3/28/2022
Doc Name
Surety Increase Response
From
M.A. Concrete Construction, Inc
To
DRMS
Type & Sequence
SI1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.A. Concrete Construction, Inc. <br /> 2323 River Road <br /> Grand Junction, CO 81505 <br /> 970-243-3221 <br /> 3/28/22 <br /> Colorado Division of Reclamation <br /> Amy Yeldell <br /> Environmental Protection Specialist <br /> RE: 32.5 Road Gravel Pit, Permit No. M-2009-035, Proposed Bond Calculation <br /> Dear Mrs.Yeldell: <br /> M.A. Concrete Construction, Inc. is requesting a recalculation of the proposed increase of bond based <br /> off of the following dimensions. The south pit has an entire shore line of approximately 4350 linear feet <br /> (If). Of the 4300 If, approximately 3500 If has a slope of anywhere between 3:1 to 5:1. Approximately <br /> 550 If has a slope of 1:1 to 3:1. The remaining 300 If has yet to be excavated with an average bank <br /> depth of 10 feet. The material needed to slope this area is on site. No cobble rock has been placed <br /> around the bank edge at this point. The cobble rock needed for the bank edge is roughly 250 cy or 375 <br /> ton. 375 ton of cobble furnished and installed runs about$30/tan which equals$11,250. <br /> We are discussing with the property owner the possibility of amending some of the reclamation plan. <br /> We are awaiting some discussions with Parks and Wildlife along with Mesa County on potential long <br /> term uses before we can submit some of the minor changes to the reclamation plan. We hope to have <br /> these recommendations by July 1, 2022. <br /> Sincerely, <br /> Andy Az2r�raga/ <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.