Laserfiche WebLink
Climax Molybdenum Company <br /> Permit No.1977-342 Technical Revision (TR-35) <br /> 2.6 Construction Quality Control/Quality Assurance <br /> The project will be divided into distinct work packages, which will each have detailed construction drawing and <br /> technical specification packages. The technical specifications will contain equipment and material specifications, <br /> project execution requirements, and quality control requirements, which will be the responsibility of the <br /> performance contractors selected to construct the facility. Henderson or the general contractor will employ third <br /> party contractors to provide specific material testing and inspection services to demonstrate compliance with the <br /> project specifications. Quality assurance, consisting of ensuring the completion of all quality control activities, <br /> review and approval of quality control results, and independent inspections and testing, will fall under the <br /> responsibilities of Henderson or it's designated Construction Manager, who will have overall responsibility for <br /> ensuring the facilities are constructed in accordance with the plans and specifications. <br /> Following completion of construction, Henderson will provide a certified verification by a registered Professional <br /> Engineer that the facility was constructed in accordance with the approved design plan, for DRMS acceptance. <br /> April 2022 9 <br />