Laserfiche WebLink
Page 19 <br /> 6.4.12 EXHIBIT L - Reclamation Costs <br /> Please Note: The per unit cost values derived from previous OMLR <br /> determinations for heavy equipment, as applied to this exhibit, are included at <br /> the back of this exhibit. Since there is no possibility of the applicant in fully <br /> reproducing the Division's methods, utilizing similarities from past OMLR <br /> calculations is the most viable and accurate means available for the applicant <br /> to derive reasonable estimates of per unit costs and should result in estimates <br /> very reliable with that of the Division. <br /> Summary of Reclamation Costs: <br /> $ 9,934.08±Site Discharge <br /> $ 53,096.28±Total Grading per Extraction Front. <br /> $ 4,182.12±Total Re-soiling <br /> 1.141.32±Total Re-vegetation Expense <br /> $ 68,353.80±Sub-Total <br /> 4.322.00±Possible Mobilization and Demobilization Costs (pending OMLR estimate) <br /> $ 72,675.80±Sub-Total Direct Costs <br /> $ 17,446.20±Possible Indirect Costs Pending RMS Indirect Costs @ 24.335 % of Total <br /> Reclamation Costs <br /> $ 90,122.00±Grand Total — Financial Warranty Amount — Pending OMLR Review <br /> and estimates including estimated expenses for State of Colorado Mobilization and <br /> Demobilization and other `Indirect' cost determinations by the Office. <br /> n <br /> i <br /> Extraction of the Core following completion of the Perimeter Extraction Keyway <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT NOVEMBER 2021 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MIING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />